Project in Frina, Yanfeng, and Doowon (Doocheon)
Project: Quality Sorting & Inspection at A Pillar Assembly
Client: PT Frina Lestari Nusantara
Location: Bekasi, Indonesia
Period: July 2022
Scope of Work:
- Comprehensive inspection of A Pillar Assembly.
- Detailed checking of adhesive condition to ensure optimal performance.
- Accurate marking and identification of non-conforming (NG) parts for further processing.
- Preparation and submission of thorough inspection reports.
Remarks:
Conducted with a dedicated team of 7 operators per day, focusing on maintaining high-quality standards through meticulous sorting and inspection processes.
Project: Quality Sorting & Inspection of Air Vents
Client: Yanfeng Global Company Interior
Location: Bekasi, Indonesia
Period: August 2022
Scope of Work:
- Comprehensive inspection and testing of air vent functionality.
- Verification of locking position to ensure secure and reliable operation.
- Assessment of noise levels and smooth rotation to meet quality standards.
- Preparation and submission of detailed inspection reports.
Remarks:
Conducted with a dedicated team of 5 operators per day, ensuring high standards of quality through meticulous sorting and inspection processes.
Project: Quality Sorting & Inspection of Air Conditioner Pipe Tube Host
Client: PT. DOOCHEON AUTOMOTIVE INDONESIA
Location: Bekasi, Indonesia
Period: October 2022 - Present
Scope of Work:
- Inspection of air conditioner pipe tube host for cleanliness, specifically checking for dirt and flux inside the tube hole.
- Ensuring that all attribute parts are in completed condition before final processing.
- Preparation and submission of detailed inspection reports.
Remarks:
Conducted with a dedicated team of 4 operators per day, ensuring high standards of quality through meticulous sorting and inspection processes.
No comments:
Post a Comment