Project in Frina, Yanfeng, and Doowon (Doocheon)

 




Project: Quality Sorting & Inspection at A Pillar Assembly

Client: PT Frina Lestari Nusantara

Location: Bekasi, Indonesia

Period: July 2022

Scope of Work:

  • Comprehensive inspection of A Pillar Assembly.
  • Detailed checking of adhesive condition to ensure optimal performance.
  • Accurate marking and identification of non-conforming (NG) parts for further processing.
  • Preparation and submission of thorough inspection reports.

Remarks:

Conducted with a dedicated team of 7 operators per day, focusing on maintaining high-quality standards through meticulous sorting and inspection processes.













Project: Quality Sorting & Inspection of Air Vents

Client: Yanfeng Global Company Interior

Location: Bekasi, Indonesia

Period: August 2022

Scope of Work:

  • Comprehensive inspection and testing of air vent functionality.
  • Verification of locking position to ensure secure and reliable operation.
  • Assessment of noise levels and smooth rotation to meet quality standards.
  • Preparation and submission of detailed inspection reports.

Remarks:

Conducted with a dedicated team of 5 operators per day, ensuring high standards of quality through meticulous sorting and inspection processes.









Project: Quality Sorting & Inspection of Air Conditioner Pipe Tube Host

Client: PT. DOOCHEON AUTOMOTIVE INDONESIA

Location: Bekasi, Indonesia

Period: October 2022 - Present

Scope of Work:

  • Inspection of air conditioner pipe tube host for cleanliness, specifically checking for dirt and flux inside the tube hole.
  • Ensuring that all attribute parts are in completed condition before final processing.
  • Preparation and submission of detailed inspection reports.

Remarks:

Conducted with a dedicated team of 4 operators per day, ensuring high standards of quality through meticulous sorting and inspection processes.






Back to Project

No comments:

Post a Comment

Formulir Kontak

Name

Email *

Message *

Find in this blog